View ad
Back

23800 DWT Bulk Carrier for sale
Category: Bulk Carriers



Ad cancelled

Name: David Tran
Address: No.5/L2, PG An Dong Zone, An Duong distric
City: Hai Phong
View profile: tvtmarine
View more ads posted by tvtmarine RSS Ads Factory
Posted on: 02/24/2010 Hits: 41

 
Tags:
Tell friend
  Description  
Description

<p>&lt;table class="tb" border="0" cellspacing="0" cellpadding="5" width="100%"&gt; &lt;tbody&gt; &lt;tr&gt; &lt;td class="activetab" align="center" bgcolor="#eeeeee"&gt;Specifications&lt;/td&gt; &lt;td class="inactivetab" colspan="3"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td colspan="2" valign="top"&gt; &lt;table border="0" cellspacing="1" cellpadding="3" width="100%"&gt; &lt;tbody&gt; &lt;tr&gt; &lt;td class="lower-dot" width="50%" align="right"&gt;Vessel name:&lt;/td&gt; &lt;td class="lower-dot" width="50%"&gt;23800 DWT BULK CARRIER&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" width="50%" align="right"&gt;Vessel condition:&lt;/td&gt; &lt;td class="lower-dot" width="50%"&gt;COMPLIES WITH I.A.C.S Ltd&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" width="50%" align="right"&gt;Vessel type:&lt;/td&gt; &lt;td class="lower-dot" width="50%"&gt;23800 DWT BULK CARRIER&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Builder:&lt;/td&gt; &lt;td class="lower-dot"&gt;MADE IN CHINA&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Model:&lt;/td&gt; &lt;td class="lower-dot"&gt;23800 DWT BULK CARRIER&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Year constructed:&lt;/td&gt; &lt;td class="lower-dot"&gt;2009&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Berths:&lt;/td&gt; &lt;td class="lower-dot"&gt;21&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Cabins:&lt;/td&gt; &lt;td class="lower-dot"&gt;11&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;No. of engines:&lt;/td&gt; &lt;td class="lower-dot"&gt;1&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Fuel type:&lt;/td&gt; &lt;td class="lower-dot"&gt;Diesel&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Drive type:&lt;/td&gt; &lt;td class="lower-dot"&gt;Shaft drive&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Crusing Speed:&lt;/td&gt; &lt;td class="lower-dot"&gt;11 Knots&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Maximum Speed:&lt;/td&gt; &lt;td class="lower-dot"&gt;13 Knots&lt;/td&gt; &lt;/tr&gt; &lt;/tbody&gt; &lt;/table&gt; &lt;/td&gt; &lt;td colspan="2" valign="top"&gt; &lt;table border="0" cellspacing="1" cellpadding="3" width="100%"&gt; &lt;tbody&gt; &lt;tr&gt; &lt;td class="lower-dot" width="50%" align="right"&gt;Nominal length:&lt;/td&gt; &lt;td class="lower-dot" width="50%"&gt;160m&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" width="50%" align="right"&gt;Length over all:&lt;/td&gt; &lt;td class="lower-dot" width="50%"&gt;159.90m&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Length at waterline:&lt;/td&gt; &lt;td class="lower-dot"&gt;153m&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Beam:&lt;/td&gt; &lt;td class="lower-dot"&gt;24.2m&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Maximum draft:&lt;/td&gt; &lt;td class="lower-dot"&gt;10.15m&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Hull material:&lt;/td&gt; &lt;td class="lower-dot"&gt;Steel&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Hull type:&lt;/td&gt; &lt;td class="lower-dot"&gt;Displacement&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Displacement:&lt;/td&gt; &lt;td class="lower-dot"&gt;23800 metric tons&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Fuel capacity:&lt;/td&gt; &lt;td class="lower-dot"&gt;1323 Cubic Metres&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="lower-dot" align="right"&gt;Water capacity:&lt;/td&gt; &lt;td class="lower-dot"&gt;454 Cubic Metres&lt;/td&gt; &lt;/tr&gt; &lt;/tbody&gt; &lt;/table&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="activetab" align="center" bgcolor="#eeeeee"&gt;Construction:&lt;/td&gt; &lt;td class="inactivetab" colspan="3"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt; &lt;blockquote&gt;This vessel was manufactured to comply with the international requirements and is available NOW for sale. There is no need to wait up to eighteen months on having one built for you.&lt;br /&gt; &lt;br /&gt; Ship Type &lt;br /&gt; This ship is a bulk carrier of entirely electric welding steel structure, single deck, aft engine, single propeller and rudder, driving by diesel engine. This ship has forecastle, poop deck and four floor deckhouses. Double bottom is arranged of bow, cargo areas and aft. It is with four cargos, three cranes (25 ton×25m). &lt;br /&gt; &lt;br /&gt; Rules, Regulations and Certificates &lt;br /&gt; BV ;Hull ;Mach Bulk Carrier ESP CSR, Ice Class 1D &lt;br /&gt; &lt;br /&gt; Rules and Regulations &lt;br /&gt; Design of the vessel is to comply with BV “Rules for the Classification of Steel Ships” ,”International Convention for the Safety of Life at Sea” and its amendments. &lt;br /&gt; &lt;br /&gt; Certificates &lt;br /&gt; •The builder will obtain following certificates and deliver to the owner at the time of ship’s delivery after qualified of the vessel. &lt;br /&gt; •Certificate for International Sailing of international voyage &lt;br /&gt; •Certificate of load line of international voyage &lt;br /&gt; •Certificate for Tonnage of international voyage &lt;br /&gt; •Certificates of International Convention for the Prevention of Pollution from ships &lt;br /&gt; •Exemption Certificates &lt;br /&gt;&lt;/blockquote&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="activetab" align="center" bgcolor="#eeeeee"&gt;Accommodation&lt;/td&gt; &lt;td class="inactivetab" colspan="3"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt; &lt;blockquote&gt;When a vessel is manufactured to comply with I.A.C.S. Ltd you know it also complies with the European way of life. This vessel has an endurance of 8000 N Miles or 15 Days at sea. When you have the responsibility to look after 21 persons then that means the planning for the voyage has to exact. The galley has to be able to sustain the Crew and the vessel has to have enough fuel. However it is the facilities you do not instantly think of that are as important. &lt;br /&gt; &lt;br /&gt; What if you take ill? – on this vessel you have a hospital where even minor operations can be performed if required.&lt;br /&gt; &lt;br /&gt; What about keeping the Crew healthy? – well as well as having a varied diet there is also a Gymnasium to let them work off steam in pleasant surroundings.&lt;br /&gt; &lt;br /&gt; What about Hygiene? – the Cabins are arranged that they are either single accommodation or two at the most. There are plenty showers on board for personal hygiene and full laundry facilities for the clothing.&lt;br /&gt; &lt;br /&gt; CABINS&lt;br /&gt; •CAPTAIN&lt;br /&gt; •FIRST OFFICER&lt;br /&gt; •SECOND OFFICER&lt;br /&gt; •THIRD OFFICER&lt;br /&gt; •BOATSWAIN&lt;br /&gt; •6 x CREW&lt;br /&gt; &lt;br /&gt; FORECASTLE&lt;br /&gt; Store room, painting room, cable room, hydraulic anchor winch control room&amp; pump station and CO2 room are arranged on forecastle which is located fore of upper deck. &lt;br /&gt; Anchor winch and mooring equipments etc. are arranged on forecastle. &lt;br /&gt; &lt;br /&gt; POOP DECK&lt;br /&gt; Poop deck and four floors deckhouses are set on aft upper deck. &lt;br /&gt; Air conditioning room, drying room, spare and cable room, gym, provision room, refrigerator room, vegetable room, meat room, fish room, store room, docker rest room, electrician room, infirmary, lavatory, laundry, bond store, changing room, clothes room, cable and pipe tunnel and CO2 room etc. are arranged of poop. &lt;br /&gt; Kitchen, still room, crew dining room(crew smoking room), store room, machine office, deck office, lavatory, officer’s mess room, officer’s smoking room, cable tunnel, pipe tunnel and some crew’s cabins etc are arranged on poop deck. &lt;br /&gt; &lt;br /&gt; ACCOMMODATION DECK&lt;br /&gt; Deckhouses of accommodation deck are divided into fireman equipment room, third officer’s room, fourth engineer’s room, emergency generator room, electrician’s room, store room, cable tunnel, pipe tunnel and some crew’s cabins. &lt;br /&gt; &lt;br /&gt; CAPTAINS DECK&lt;br /&gt; Deckhouses of captain deck are divided into first officer’s room, captain room, meeting room, second officer’s room, third engineer’s room, chief engineer’s room, second engineer’s room, pilot room, cable tunnel and pipe tunnel etc. &lt;br /&gt; &lt;br /&gt; BRIDGE DECK&lt;br /&gt; Deckhouses of bridge deck are divided into navigation room, lavatory, charging room, battery room, navigation equipments room and chart room etc. &lt;br /&gt; &lt;br /&gt; COMPASS DECK&lt;br /&gt; Aft mast, radar, mast light , signal light, not under command light, communication flash light, swerve light, air horn, search light and magnetism compass are set on compass deck. &lt;br /&gt; &lt;br /&gt; •Bridge room &lt;br /&gt; •Electrician store &lt;br /&gt; •Engine department office &lt;br /&gt; •Deck department office &lt;br /&gt; •Officer dining room&lt;br /&gt; •Mess room &lt;br /&gt; •Gymnasium &lt;br /&gt; •Meeting room &lt;br /&gt; •Officer’s day room &lt;br /&gt; •Washing room &lt;br /&gt; •Laundry &lt;br /&gt; •Changing room &lt;br /&gt; •Infirmary &lt;br /&gt; •Galley &lt;br /&gt; &lt;br /&gt; &lt;br /&gt;&lt;/blockquote&gt; &lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="activetab" align="center" bgcolor="#eeeeee"&gt;Images&lt;/td&gt; &lt;td class="inactivetab" colspan="3"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="2" width="50%" align="center"&gt;&lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=5"&gt; &lt;img src="http://commercial.apolloduck.com/image_bin/preview_125737_5.jpg" border="1" alt="Click for full size image" width="230" height="173" /&gt;&lt;/a&gt;&lt;br /&gt; &lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=5"&gt;View Full Size Image&lt;/a&gt;&lt;/td&gt; &lt;td class="cp" colspan="2" width="50%" align="center"&gt;&lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=6"&gt; &lt;img src="http://commercial.apolloduck.com/image_bin/preview_125737_6.jpg" border="1" alt="Click for full size image" width="230" height="173" /&gt;&lt;/a&gt;&lt;br /&gt; &lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=6"&gt;View Full Size Image&lt;/a&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="2" width="50%" align="center"&gt;&lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=7"&gt; &lt;img src="http://commercial.apolloduck.com/image_bin/preview_125737_7.jpg" border="1" alt="Click for full size image" width="230" height="173" /&gt;&lt;/a&gt;&lt;br /&gt; &lt;a href="http://commercial.apolloduck.com/image.phtml?id=125737ℑ=7"&gt;View Full Size Image&lt;/a&gt;&lt;/td&gt; &lt;td class="cp" colspan="2" width="50%" align="center"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="activetab" align="center" bgcolor="#eeeeee"&gt;Equipment&lt;/td&gt; &lt;td class="inactivetab" colspan="3"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt;&lt;/td&gt; &lt;/tr&gt; &lt;tr&gt; &lt;td class="cp" colspan="4"&gt; &lt;blockquote&gt;DECK MACHINERY &lt;br /&gt; •Arrangement of deck machinery detail in General Arrangement and other equipment arrangement drawings. &lt;br /&gt; &lt;br /&gt; HYDRAULIC COMBINED ANCHOR WINCH &lt;br /&gt; •2 sets anchor winch are fitted on forecastle deck which type are horizontal electrical hydraulic combined. Each one is set with one sprocket, 2 separate cable drum and one aux cable drum. One clutch and handle brake are set for sprocket and mooring drum. When sprocket and mooring drum are separated by clutch, aux drum can be operated. Operating handle is set beside of anchor winch which is set with measuring equipments. &lt;br /&gt; •Ropes capacity of cable drum is ¦100mm×220m and its middle is set with diaphragm.&lt;br /&gt; •Power of anchor winch is set in hydraulic station on upper deck bow. &lt;br /&gt; •Anchor winch should have BV certificate. &lt;br /&gt; &lt;br /&gt; HYDRAULIC MOORING WINCH &lt;br /&gt; •2 sets electrical hydraulic mooring winch are set on poop deck with 2 cable drums and 1 aux drum. Rope capacity of cable drum for each winch is¦10mm×220m and its middle is set with diaphragm. One clutch and handle brake are set for each cable drum. When cable drum is separated by clutch, aux drum can be operated. Operating handle is set beside of mooring winch which is set with measuring equipments. &lt;br /&gt; •Power of mooring winch is set in steering gear room. &lt;br /&gt; •Mooring winch should have BV certificate. &lt;br /&gt; &lt;br /&gt; HYDRAULIC STEERING GEAR &lt;br /&gt; •One set 450KN.m steering gear is set for the vessel that type is electrical hydraulic fork and is equipped with 2 sets pumps group which is composed by motor, valves and oil tanks. Valves group can be directly controlled and operated from bridge room or steering gear room, so as started and stopped motor. &lt;br /&gt; •Steering gear can be started by any one pump group. &lt;br /&gt; •When the vessel is sailing at maximum speed, steering gear started by one pump group can rotate rudder from one side35º to another side 30º in 28 seconds. &lt;br /&gt; •Auto-pilot unit can automatic, servo and handle steering in bridge room. &lt;br /&gt; •Auto alarm device for lost electricity, overload, low level and phase broken are set in bridge room and engine monitoring room. Rudder angle indicator is respectively set in bridge room and steering gear room. &lt;br /&gt; •Hydraulic steering gear should have BV certificate. &lt;br /&gt; &lt;br /&gt; ELECTRICAL ACCOMMODATION LADDER WINCH &lt;br /&gt; •Electrical accommodation ladder winch is set at both sides of ladder of upper deck aft. &lt;br /&gt; •Electrical accommodation ladder winch should have BV certificate. &lt;br /&gt; &lt;br /&gt; SPARES FOR DECK MACHINERY &lt;br /&gt; •Equipping for spares is to comply with the requirements of classification and shipowner. &lt;br /&gt; &lt;br /&gt; ANCHOR &lt;br /&gt; •TypeSpeke anchor &lt;br /&gt; •Quantity2 bow anchors, 1 spare anchor &lt;br /&gt; •Weight6000kg of each anchor &lt;br /&gt; •Spare one is set at port side of upper deck front. &lt;br /&gt; &lt;br /&gt; ANCHOR CHAIN &lt;br /&gt; •Diameter of chain¦60mm &lt;br /&gt; •TypeQ3 stud link chain &lt;br /&gt; •Lengthtwo of 577.5m each one for port and starboard&lt;/blockquote&gt; &lt;/td&gt; &lt;/tr&gt; &lt;/tbody&gt; &lt;/table&gt;</p>

   Messages   
Sender To Send message Date
Send message
To: 
View map

Browse offers